Annual report pursuant to Section 13 and 15(d)

Commitments and Contingencies

v3.19.2
Commitments and Contingencies
12 Months Ended
Mar. 31, 2019
Commitments and Contingencies  
Commitments and Contingencies

13. Commitments and Contingencies

Purchase Commitments

As of March 31, 2019, the Company had firm commitments to purchase inventories of approximately $33.4 million through Fiscal 2020. Certain inventory delivery dates and related payments are not scheduled; therefore amounts under these firm purchase commitments will be payable upon the receipt of the related inventories.

Lease Commitments

The Company leases offices and manufacturing facilities under various non‑cancelable operating leases expiring at various times through the fiscal year ending July 2, 2025. All of the leases require the Company to pay maintenance, insurance and property taxes. The lease agreements for primary office and manufacturing facilities provide for rent escalation over the lease term and renewal options for five‑year periods. Rent expense is recognized on a straight-line basis over the term of the lease. The difference between rent expense recorded and the amount paid is credited or charged to deferred rent, which is included in other long‑term liabilities in the accompanying consolidated balance sheets. The balance of deferred rent was approximately $0.3 million and $0.4 million as of March 31, 2019 and 2018, respectively. Rent expense was approximately $2.3 million and $2.2 million for the fiscal years ended March 31, 2019 and 2018, respectively.

On July 31, 2014, the Company and Northpark Industrial (“Northpark”) entered into a Third Amendment to Lease (the “Third Amendment”) to amend the Standard Industrial/Commercial Single-Tenant Lease - Net, dated December 1, 1999, as amended (the “Lease”), pursuant to which the Company leases the premises located at 21211 Nordhoff Street, Chatsworth, California. During the fiscal year ended March 31, 2019, the Company consolidated its operations and offices into its leased premises located in Van Nuys, California. The Third Amendment extended the term of the Lease for a period of two months commencing on August 1, 2014 and ending on September 30, 2014 and set the monthly base rent payable by the Company under the Lease at $81,001 per month.

On September 30, 2014, the Company and Northpark entered into a Fourth Amendment to Lease (the “Fourth Amendment”) to amend the Lease by extending the term of the Lease for a period of five years commencing on October 1, 2014 and ending on September 30, 2019. The Fourth Amendment also adjusts the monthly base rent payable by the Company under the Lease to the following: $39,500 per month from October 1, 2014 through November 30, 2014; $79,000 per month from December 1, 2014 through September 30, 2015; $81,225 per month from October 1, 2015 through September 30, 2016; $83,600 per month from October 1, 2016 through September 30, 2017; $86,000 per month from October 1, 2017 through September 30, 2018; and $88,500 per month from October 1, 2018 through September 30, 2019.  The Fourth Amendment also provides the Company with an option to extend the Lease by an additional five-year term following the expiration of the term of the Lease as amended by the Fourth Amendment and provides that Northpark will perform certain capital improvements to the leased premises’ HVAC system.

On March 28, 2013, the Company and Prologis, L.P., formerly known as AMB Property, L.P., entered into a third amendment (the “Van Nuys Third Amendment”) to the Lease Agreement dated September 25, 2000, for leased premises located at 16640 Stagg Street, Van Nuys, California for use as primary office space, engineering testing and manufacturing. The Van Nuys Third Amendment extends the term of the Lease Agreement from December 31, 2012 to December 31, 2017. The Van Nuys Third Amendment also adjusts the monthly base rent payable by the Company under the Lease Agreement to the following: $60,000 per month from January 1, 2013 through June 30, 2015 and $65,000 per month from July 1, 2015 through December 31, 2017.

On June 7, 2017 the Company and Prologis, L.P entered into a Fourth Amendment to Lease (the “Van Nuys Fourth Amendment”) to amend the Lease by extending the term of the Lease for a period of sixty-two (62) months commencing on December 31, 2017 to February 28, 2023. The Van Nuys Fourth Amendment also adjusts the monthly base rent payable by the Company under the Lease Agreement to the following: $0 per month from January 1, 2018 through February 28, 2018; $66,846 per month from March 1, 2018 through December 31, 2018; $68,852 per month from January 1, 2019 through December 31, 2019; $70,917 per month from January 1, 2020 through December 31, 2020; $73,045 per month from January 1, 2021 through December 31, 2021; $75,236 per month from January 1, 2022 through December 31, 2022; and $77,493 per month from January 1, 2023 through February 28, 2023. The Van Nuys Fourth Amendment also provides the Company with an option to extend the Lease by an additional five year term following the expiration of the term of the Lease as amended by the Lease Amendment and provides that Prologis, L.P. will contribute a tenant improvement allowance toward the Company’s approved alterations to the premises.

At March 31, 2019, the Company’s minimum commitments under non-cancelable operating leases were as follows (in thousands):

 

 

 

 

 

 

 

Operating

 

Year Ending March 31,

    

Leases

 

2020

 

$

1,464

 

2021

 

 

958

 

2022

 

 

984

 

2023

 

 

933

 

2024

 

 

101

 

Thereafter

 

 

126

 

Total minimum lease payments

 

$

4,566

 

 

Other Commitments

The Company has agreements with certain of its distributors requiring that if the Company renders parts obsolete in inventories the distributors own and hold in support of their obligations to serve fielded microturbines, then the Company is required to replace the affected stock at no cost to the distributors. While the Company has never incurred costs or obligations for these types of replacements, it is possible that future changes in the Company’s product technology could result and yield costs to the Company if significant amounts of inventory are held at distributors. As of March 31, 2019, no significant inventories were held at distributors.

Legal Matters

Federal Securities Class Action

Two putative securities class action complaints were filed against the Company and certain of its current and former officers in the United States District Court for the Central District of California under the following captions:  David Kinney, etc. v. Capstone Turbine, et al., No. 2:15-CV-08914 on November 16, 2015 (the “Kinney Complaint”) and Kevin M. Grooms, etc. v. Capstone Turbine, et al., No. 2:15-CV-09155 on December 18, 2015 (the “Grooms Complaint”).

The putative class in the Kinney Complaint is comprised of all purchasers of the Company’s securities between November 7, 2013 and November 5, 2015.  The Kinney Complaint alleges material misrepresentations and omissions in public statements regarding BPC and the likelihood that BPC would not be able to fulfill many legal and financial obligations to the Company.  The Kinney Complaint also alleges that the Company’s financial statements were not appropriately adjusted in light of this situation and were not maintained in accordance with GAAP, and that the Company lacked adequate internal controls over accounting.  The Kinney Complaint alleges that these public statements and accounting irregularities constituted violations by all named defendants of Section 10(b) of the Exchange Act, and Rule 10b-5 thereunder, as well as violations of Section 20(a) of the Exchange Act by the individual defendants.  The Grooms Complaint makes allegations and claims that are substantially identical to those in the Kinney Complaint, and both complaints seek compensatory damages of an undisclosed amount.  On January 16, 2016, several shareholders filed motions to consolidate the Kinney and Grooms actions and for appointment as lead plaintiff.  On February 29, 2016, the Court granted the motions to consolidate, and appointed a lead plaintiff.  On May 6, 2016, a Consolidated Amended Complaint with allegations and claims substantially identical to those of the Kinney Complaint was filed in the consolidated action.  The putative class period in the Consolidated Amended Complaint is June 12, 2014 to November 5, 2015.  Defendants filed a motion to dismiss the Consolidated Amended Complaint on June 17, 2016. On March 10, 2017, the Court issued an order granting Defendants’ motion to dismiss in its entirety with leave to amend. Plaintiffs filed an amended complaint on April 28, 2017. On February 9, 2018, the Court issued an Order denying Defendants’ motion to dismiss. On March 30, 2018, Defendants filed an answer to the Consolidated Amended Complaint. On May 17, 2018, the Court issued a scheduling order setting a trial date of March 17, 2020. On June 26, 2018, the Court entered an order vacating all deadlines through the end of October 2018 and temporarily staying formal discovery and other proceedings to allow the parties time to conduct a mediation. The parties participated in mediation on September 24, 2018, which did not result in a settlement. On November 16, 2018, after further settlement discussions, the parties advised the Court that they had reached an agreement in principle to settle the action in its entirety. The agreement in principle is subject to several conditions, including the execution of a stipulation of settlement that is satisfactory to all parties, and preliminary and final approval from the court, among other things. Plaintiffs filed a motion seeking preliminary approval of the proposed settlement on April 12, 2019, and filed supplementary declarations in support of the motion on May 2, 2019. A hearing on the motion for preliminary approval of the settlement is scheduled for May 17, 2019. If the settlement is finalized and approved by the Court, the Company’s insurance carrier will fund the settlement amount. We have not recorded any liability as of March 31, 2019 since any potential loss is not considered material as our insurance carrier will fund the settlement amount.

Federal Individual Securities Action

An individual securities complaint was filed against us, our Chief Executive Officer, and additional unidentified defendants in the United States District Court for the Central District of California under the following caption:  FiveT Investment Management LTD, et al., v. Capstone Turbine, et al., No. 2:18-CV-03512 on April 25, 2018.  The lawsuit alleges material misrepresentations and omissions regarding our revenue, sales, and operations because of alleged improper revenue recognition and backlog calculations related to BPC. The lawsuit alleged that these statements constituted violations by all named defendants of Section 10(b) of the Exchange Act, and Rule 10b-5 thereunder, as well as violations of Section 20(a) of the Exchange Act by the individual defendants. The complaint also asserted claims against all named defendants for fraud, negligent misrepresentation, violations of California Civil Code sections 1709 and 1710, and California Corporations Code sections 25400 and 25401. Additionally, the complaint asserted a cause of action against the individual defendants for breach of fiduciary duty. It demanded compensatory damages for the amount of damages allegedly suffered, pre-judgment and post-judgment interest, and fees.

On June 29, 2018, the plaintiffs filed an Amended Complaint for Common Law Fraud and Negligent Misrepresentation.  The Amended Complaint asserted claims for common law fraud and negligent misrepresentation, against the Company, Mr. Jamison, and unidentified individual defendants. The Amended Complaint demanded damages in an unspecified amount, plus pre-judgment and post-judgment interest and fees.  Defendants filed their answer to the Amended Complaint on August 17, 2018. The parties participated in a mediation on September 24, 2018.  The mediation did not result in a settlement.  On October 12, 2018, the plaintiffs filed a motion for leave to amend their complaint, seeking to reinstate the cause of action for violation of California Civil Code section 25401.  On November 29, 2018, the Court granted plaintiffs’ motion for leave to amend and plaintiffs filed their Second Amended Complaint, which asserted claims for common law fraud, negligent misrepresentation, and violation of California Civil Code section 25401 against the Company, Mr. Jamison, and unidentified individual defendants. On December 20, 2018, defendants filed their answer to the Second Amended Complaint. On June 6, 2019, the parties reached a confidential settlement of the action. We have not recorded any liability as of March 31, 2019 as our insurance carrier will fund the settlement amount.   

State Derivative Lawsuits — California

On February 18, 2016, a purported shareholder derivative action was filed in Los Angeles Superior Court in the State of California against us and certain of our current and former officers and directors under the following caption:  Stesiak v. Jamison, et al., No. BC610782.  The lawsuit alleges that certain of our current and former officers and directors knew or should have known that BPC would be unable to fulfill its obligations to us, but allowed us to make false and misleading statements regarding BPC and our financial condition.  The complaint also alleges that the defendants failed to timely adjust our account receivables and backlog to reflect BPC’s inability to pay us.  The complaint asserts causes of action for breach of fiduciary duty and unjust enrichment.  It demands damages for the amount of damage sustained by us as a result of the individual defendants’ alleged breach of fiduciary duties and unjust enrichment, that we institute corporate governance reforms, and disgorgement from the individual defendants.  On May 5, 2016, the parties filed a stipulation and proposed order seeking to stay this action until such time as the defendants’ motion(s) to dismiss the federal securities class action are either granted with prejudice or denied in whole or in part. On May 10, 2016, the Court entered that proposed order. On March 9, 2018, following the Court’s order denying Defendants’ motion to dismiss in the federal securities class action, the parties filed a stipulation and proposed order seeking to stay this action until the close of fact discovery in the federal securities class action. On March 20, 2018, the Court entered that proposed order. A status conference is scheduled for July 29, 2019.

On June 8, 2016, a purported shareholder derivative action entitled Velma Kilpatrick v. Simon, et al., No. BC623167, was filed in Los Angeles Superior Court in the State of California against us and certain of our current and former officers and directors.  The complaint alleges that certain of our current and former officers and directors knew or should have known that BPC would be unable to fulfill its obligations to us, but allowed us to make false and misleading statements regarding BPC and our financial condition.  The complaint also alleges that the defendants failed to timely adjust our account receivables and backlog to reflect BPC’s inability to pay us.  The complaint asserts causes of action for breach of fiduciary duty.  It demands damages for the amount of damage sustained by us as a result of the individual defendants’ alleged breach of fiduciary duties, and that we institute corporate governance reforms. On August 23, 2016, the parties filed a stipulation and proposed order seeking to stay this action until such time as the defendants’ motion(s) to dismiss the federal securities class action are either granted with prejudice or denied in whole or in part. On March 9, 2018, following the Court’s order denying Defendants’ motion to dismiss in the federal securities class action, the parties filed a stipulation and proposed order seeking to stay this action until the close of fact discovery in the federal securities class action. On March 20, 2018 the Court entered that proposed order. A status conference is scheduled for July 29, 2019.

The parties in both of the above state derivative lawsuits participated in a mediation held on September 24, 2018. The parties did not reach a settlement on the day of the mediation and negotiations are ongoing.

Federal Derivative Lawsuits

On March 7, 2016, a purported shareholder derivative action was filed in the United States District Court for the Central District of California against us and certain of our current and former officers and directors under the following caption:  Haber v. Jamison, et al., No. CV16-01569-DMG (RAOx).  The lawsuit alleges that certain of our current and former officers and directors knew or should have known that BPC would be unable to fulfill its obligations to us, but allowed us to make false and misleading statements regarding BPC and our financial condition.  The complaint asserts a cause of action for breach of fiduciary duty.  It demands damages for the amount of damage sustained by us as a result of the individual defendants’ alleged breach of fiduciary duties, and equitable relief, including that we institute appropriate corporate governance reforms.  On May 11, 2016, the parties filed a stipulation and proposed order seeking to stay this action until such time as the defendants’ motion(s) to dismiss the federal securities class action are either granted with prejudice or denied in whole or in part. On May 13, 2016, the Court entered that proposed order.  

On July 12, 2016 and July 18, 2016, respectively, two additional purported shareholder derivative actions were filed in the United States District Court for the Central District of California against us and certain of our current and former officers and directors, under the caption Tuttle v. Atkinson, et al., No. CV16-05127, and Boll v. Jamison, et al., No. CV16-5282, respectively.  The lawsuits allege that certain of our current and former officers and directors knew or should have known that BPC would be unable to fulfill its obligations to us, but allowed us to make false and misleading statements regarding BPC and our financial condition.  The Tuttle complaint asserts causes of action for breach of fiduciary duty, gross mismanagement, and unjust enrichment, and the Boll complaint asserts causes of action for breach of fiduciary duty, unjust enrichment, abuse of control, gross mismanagement, and waste of corporate assets.  Both complaints demand damages sustained by us as a result of the individual defendants’ alleged breaches of fiduciary duties, and equitable relief, including that we institute appropriate corporate governance reforms. The federal derivative actions were stayed until such time as the defendants’ motion(s) to dismiss the federal securities class action are either granted with prejudice or denied in whole or in part. On March 9, 2018, following the Court’s order denying Defendants’ motion to dismiss in the federal securities class action, the parties filed a stipulation and proposed order seeking to stay this action until the close of fact discovery in the federal securities class action. On March 13, 2018, the Court granted the parties’ stipulation.

 

The parties in both of the above federal derivative lawsuits participated in a mediation held on September 24, 2018. The parties did not reach a settlement on the day of the mediation and negotiations are ongoing.

Shareholder Demand

 

By letter dated July 7, 2017 (the “Shareholder Demand”), Andre Rosowsky demanded that the Board of Directors take action to remedy purported breaches of fiduciary duties allegedly related to the claims asserted in the above-discussed securities class action and derivative actions. On July 25, 2017, the Company acknowledged receipt of the Shareholder Demand and requested information from Mr. Rosowsky sufficient to show that he had standing to make the demand. The Board of Directors formed a committee to evaluate the Shareholder Demand in anticipation of receiving the requested information from Mr. Rosowsky. Mr. Rosowsky has failed to respond to the request for information and therefore the Company believes that Mr. Rosowsky abandoned the Shareholder Demand. 

 

Capstone Turbine Corporation v. Regatta Solutions, Inc.

On August 23, 2018, we initiated arbitration proceedings against its former distributor, Regatta Solutions, Inc. (“Regatta”), with the American Arbitration Association, under the following caption: Capstone Turbine Corp. v. Regatta Solutions, Inc., Case No. 01-18-0003-0860 (the “Capstone-Regatta Arbitration”). We have alleged claims against Regatta for breach of contract and unjust enrichment relating to the parties’ prior distributor relationship, which terminated at the end of March of 2018, and the related wind-down agreement between the parties. As remedies for these claims, we are seeking compensatory, consequential, and punitive damages, along with declaratory relief and attorney’s fees, interest, and costs.

On October 18, 2018, Regatta filed its answer and cross-claims in the Capstone-Regatta Arbitration. In its cross-claims, Regatta has asserted claims for breach of contract, intentional interference with prospective economic advantage, fraud, and intentional interference with contractual relations, relating to the parties’ agreement to wind-down relations and Regatta’s purported sales efforts in California. As remedies for these alleged claims, Regatta is seeking no less than $1.5 million in general and compensatory damages, along with punitive and exemplary damages, as well as attorney’s fees and costs. We have filed and served an answering statement denying Regatta’s counterclaims and asserting several affirmative defenses.

Also on October 18, 2018, Regatta filed a lawsuit in the Superior Court of the State of California, County of Orange, alleging two counts of fraud, and one count of interference with contractual relations, individually against Mr. James Crouse, Executive Vice President of Sales for us, arising out of the same allegations made in Regatta’s counterclaim. As remedies for these alleged claims, Regatta again sought no less than $1.5 million in general and compensatory damages, along with punitive and exemplary damages, as well as attorney’s fees and costs. The case was filed under the caption Regatta Solutions, Inc., v. Jim Crouse, et. al., Case No. 30-2018-01026571-CU-FR-CJC. On December 14, 2018, Regatta stipulated and agreed to arbitrate its claims against Mr. James Crouse and dismissed him from the Superior Court action.

On January 16, 2019, the parties participated in a mediation that did not resolve the dispute. The parties continued their settlement discussions and held a follow-on mediation on April 24, 2019 at which point the parties did come to a resolution of the matter. The parties are currently engaged in drafting a more formal settlement agreement that upon execution will require the respective matters to be dismissed. The Company has not recorded any liability as of March 31, 2019, since any potential loss is not probable or reasonably estimable given the current status of the proceedings.

Capstone Turbine Corporation v. Energy Systems, Inc.

On August 17, 2018 Capstone initiated arbitration proceedings against its former distributor, Energy Systems of Caribbean, Inc. (“Energy Systems”) by seeking declaratory relief that its action in terminating the distributorship was justified under the law. The claim was filed with the American Arbitration Association under the following caption: Capstone Turbine Corp. v. Energy Systems of Caribbean, Inc., Case No. 01-18-0003-1307. As remedies for these claims, we are seeking declaratory relief and attorney’s fees, interest and costs.

On August 22, 2018, Energy Systems filed a claim against us in Puerto Rico alleging Breach of Distribution Contract under Law No. 75 of June 24, 1964, as amended, 10 l.p.r.a. §§ 278-278. The case was filed under the caption Energy Systems of Caribbean, Inc., v. Capstone Turbine Corporation, CIVIL NO. SJ2018cv06543 (904). As remedies for these alleged claims, Energy Systems seeks actual damages, injunctive relief, attorney’s fees and costs. This matter was subsequently removed to the United States District Court for the District of Puerto Rico based on diversity jurisdiction (Case No. 3:18-cv-01611). The parties have since stipulated to a stay of both the federal litigation and arbitration so that the parties may pursue settlement.

The parties entered into settlement discussions and on April 29, 2019 participated in mediation to resolve the dispute. The mediation was successful and the parties are currently drafting a more formal settlement agreement that upon execution will require the respective matters to be dismissed. We have not recorded any liability as of March 31, 2019 since any potential loss is not considered material.